We take pride in our wide range of projects, showcasing our expertise in the electrical utility industry. From residential installations to large-scale, complex industrial projects, our portfolio highlights our commitment to quality and safety in every job we undertake. Our experienced Linemen, Electricians, Equipment Operators, and specialized staff work closely with our clients to deliver customized solutions that meet their unique needs and exceed their expectations. Browse our portfolio to see some of the exciting projects we have completed and get inspiration for your next electrical project.

Projects

EV2020 230 kV Interconnect (Gateway)

EV2020 230 kV Interconnect (Gateway)

Wyoming

Installation and replacement of 230kV transmission line between the Shirley Basin, Freezeout, Standpipe, and the proposed Aeolus substations.

Read More
PacificCorp Aeolus 12.5kV Distribution Line

PacificCorp Aeolus 12.5kV Distribution Line

Wyoming

Designing a 12.5kV distribution line from Medicine Bow substation to Aeolus substation. The line will have a three-phase single circuit with a neutral below.

Read More
Bar Nunn and Casper Transmission Line

Bar Nunn and Casper Transmission Line

Wyoming

At the Bar Nun Substation we will construct a new 116-12.47kV Substation.

Read More
Red Butte Substation Upgrade

Red Butte Substation Upgrade

Wyoming

Convert from 69kV to 15kV, replace 69/12.5kV transformer with 115/12.5kV transformer, add 12.5kV bus tie position, new control house, add 115kV breaker position toward Casper WAPA, 115kV CCVT's

Read More
Pumpkin Buttes - Windstar 230 kV Transmission

Pumpkin Buttes – Windstar 230 kV Transmission

Wyoming

Construction of approximately 70 miles of new 230 kV transmission line. Including Foundations, structure assemblies, right of way clearing, and substation work.

Read More
Shirley Basin

Shirley Basin

Wyoming

Construction of a new 230kV point of interconnects substation and 5 miles of double bundle transmission line.

Read More
Tide Flats Transmission Line Rebuild

Tide Flats Transmission Line Rebuild

Washington

3 Miles of 69 kV Transmission Line Rebuild, using piling with depths up to 40’ and the use of mats across the tide field.

Read More
Utah Data Center

Utah Data Center

Utah

Probst Electric was subcontracted to Ludvik Electric to perform over three miles of duct bank installation, medium voltage (MV) conductor/splice/termination installation for highly secure Government installation. This project is similar to the LLNL EEDS project in many ways.

Read More
Lower Snake Transmission

Lower Snake Transmission

Washington

12 Miles of bundle 230kV with 34.5kV under build H-Frame.